Osikonmäki

Summary
- Osikonmäki property consists of a 3km Au mineralised shear
- Past work focussed on the eastern 900 m of the shear, Osikonmäki East
- Osikonmäki E – JORC compliant inferred resource 1.9 Mt @ 2.1 g/t Au (129,000 oz Au)
- Validation drilling completed
- Geological model confirmed
- Mineralisation remains open in all directions
- Further lodes are likely to be defined, such as the partially defined Osikonmäki West deposit.
Current Status
- Geological modelling of latest drilling ongoing
- Recent drilling intersected 22.31m of 2.64 g/t Au, 14.78m of 2.95 g/t Au, demonstrating grade and continuity on the mineralisation
- Regional till geochem survey completed and results being evaluated
Last Updated Wednesday August 8, 2007