Please enter a search term to begin your search.
Osikonmäki

Summary
- Osikonmäki property consists of a 3km sub-cropping Au mineralised shear
- Past work focussed on the eastern 900 m of the shear, Osikonmäki East (>10,000 m of historical drilling)
- Osikonmäki E – JORC compliant Indicated resource 1.3 Mt @ 1.7 g/t Au (68,000 oz Au)
- Osikonmäki E – JORC compliant Inferred resource 3.54 Mt @ 2.1 g/t Au (244,000 oz Au)
- Osikonmäki W – Historical resource 3.54 Mt @ 2.1 g/t Au (244,000 oz Au)
- Validation drilling completed
- Geological model confirmed
- Mineralisation remains open in all directions
- Further lodes are likely to be defined, such as the partially defined Osikonmäki West deposit.
Current Status
- Regional till geochem survey and boulders trains indicate similar shears likely in the area
-
Drill Hole Location and gold lodes using a 0.6 g/t cut-off
-
Claim Position
-
3d block model of Osikonmaki east gold lodes
-
Rantasalmi Geology showing Osikonmki and Pirila claims